All projects
JVC master bathroom
Developer-standard bathroom replaced with a walk-in shower, microcement walls and a floating vanity.

The brief.
A bathtub nobody used, dated tiles and poor extraction. The owner wanted a calm, easy-to-clean room.
What we did.
Full strip-out, new waterproofing and falls, a linear drain walk-in shower, microcement on walls and floor, a floating oak vanity and a properly ducted extractor.
The result.
One room, three weeks, no leaks. The owner has since booked the second bathroom.

Have a similar property?
Send us a few photos on WhatsApp and we will tell you what is realistic and roughly what it costs.

